Keller UK handled the design and construction of the 141 Harley Street project in London, UK.
Keller's specialist restricted access team designed and constructed a 73 linear meter secant piled retaining wall, a 35 linear meter contiguous piled retaining wall and load-bearing piles in limited space conditions. Thereby, the excavation of a three-story basement in central London to accommodate a new proton beam therapy facility was enabled.
Source: Keller
Pile foundation is actually a slender column or long cylinder made of materials such as concrete...
Keller, world’s leader in geotechnical solutions, announces the completion of its first interlockin...
Keller is installing more than 400 continuous flight auger (CFA) piles to depths of up to 200 ft, t...
Keller will participate in a Miami project in which, for the first time in 50 years, auger cast pil...
Helical pile installers and designers get this question all the time: “Do I need to do full scale l...
The problem of analyzing and designing deep foundations is relevant to many civil engineering struc...
Looking for more information? Fill in the form and we will contact Keller for you.