Snowy 2.0 has reached a major construction milestone as TBM Lady Eileen Hudson completes the 6 km tailrace tunnel. The breakthrough advances underground works linking the future power station to Talbingo Dam, supporting Australia’s long-term renewable energy storage and grid reliability goals. Read more: https://www.geoengineer.org/news/tailrace-tunnel-breakthrough-advances-australias-largest-renewable-project #Snowy20 #RenewableEnergy #Hydropower #PumpedHydro #AustraliaEnergy #CleanEnergy #EnergyStorage #Infrastructure #Tunnelling #SnowyMountains #ConstructionNews #Engineering #GridReliability Credits: @SnowyHydro