Going digital: Winning the race to deliver AI-scale data centers begins on Jun 24th 2026
Easily define reinforcement in the tunnel designer
News Retaining Walls Shallow Foundations Deep Foundations Geosynthetics Ground Improvement Finite Element / Finite Difference Rock Engineering Slope Stability Soil Mechanics Tunneling Underground Structures

Use the tunnel designer in PLAXIS 2D to quickly generate reinforcement patterns with rock bolt or cable bolt elements on the underground excavation perimeter or tunnel lining. Defined reinforcement sets can later be changed easily by updating the spacing, length or number of bolts and regenerating the tunnel geometry.