Optimizing Soldier Pile Wall Displacements: DRS Engineering’s Smart, Cost-effective Results begins on Jul 15th 2026
Work to prevent landslips on the East Coast Main Line
News Landslides Railway Geotechnics

👷 We're working to prevent landslips on the #EastCoastMainLine. ✅ Installing 529 piles up to 25-metres deep. ✅ Improving railway drainage. ✅ Widening the embankment. ✅ Planting new trees and new wildflower meadows to strengthen the ground. 👉 https://www.networkrailmediacentre.co.uk/news/mammoth-gbp-33m-prevention-project-to-tackle-east-coast-main-line-landslips-1