The inspection of helical pile installation is needed to ensure the pile will perform as intended as a load bearing foundation. The supervisor is responsible to perform several checks of equipment, evidence of training, proper execution of installation, and record keeping.
When installing a helical pile foundation, the installing contractor is responsible for inspection and keeping good records. In some jurisdictions subject to building code requirements, special inspection by a qualified third-party representative is required.
Detailed training for helical pile inspection is available in Chance University as part of the Certified Installer Program. Click the link to get registered for the course.
Learn how to become a Chance Certified Installer
Before Installation Checks
By performing a thorough inspection before work begins, you can help ensure your team has a safer and more productive installation.
Some helpful tools for the inspector include:
Your phone will prove very handy for many of these tasks. If you plan on using the Chance Digital Torque Indicator, make sure the app is installed.
Depending on how the project was bid, the helical pile contractor may be responsible for site surveys, checking easements, utility locates, and a testing program, among other things. For prescriptive specifications, the inspector should check to ensure the specified helical pile lead sections, extensions, and pile caps are on the jobsite.
It’s important to check the machine and tooling to be used. Ensure that the installation equipment, torque motor, and tooling are right-sized for the job and torque requirements.
Inspection During Installation
A supervisor should be active on the jobsite, ensuring that installation occurs safely and correctly.
To ensure best performance, the helical pile RPM and advancement rate should be monitored and documented by using a stopwatch and tape measure. This ensures the helical pile is advancing into the soil like a screw with minimal disturbance. Proper advancement rate is required for the torque correlation capacity method to work. Downward force or “crowd” is a key factor for proper advancement rate. The machine operator must “follow” the helical pile as it advances. Crowd is not easily documented, so the inspector should watch the machine to make sure downward force or “down pressure” is being applied during installation. It is a good idea to ask the operator when they were trained and how many helical piles they have installed.
Other recordables are the pile tip depth, which is used to ensure the helix plates are deep enough below grade and also to ensure the helix plates are located in load bearing soil. This is done by measuring the length of the helical pile sections and recording the number of plain extensions installed. The pile location, inclination, plumbness must also be checked and documented. Inclination can be checked with a hand level.
Get the Chance Installation Log Form to use on the Jobsite
An inspector should ensure the pile extensions are properly tightened. Pile termination criteria such as minimum effective torque and minimum tip embedment depth should be verified. Termination devices such as brackets or pile caps should be located correctly and mounted flush with the top of the pile shaft.
After the Installation
An inspector’s job is not done when the installation is over for the day! If you keep good records throughout the installation, this part of the job should be much easier. Required documentation will vary by project but some items that may be needed include:
Resources to help
All of these steps have been compiled in an easy-to-reference Inspector’sChecklist. Download yours today and save or print for easy reference on your next job site.
If you would like to learn more about helical pile installation and learn how to grow your business as a Chance Certified Installer, click this link to learn more.
Source: Helical Pile Inspection – Supervisor Responsibilities on the Construction Site
This interesting case study features the use of helical piles for a deep foundation on a new constr...
Situated on the sandy shores of the Gulf Coast, this new construction residence required a foundati...
When it comes to deep foundations and high capacity piles in general, helical piles are often overl...
Learn how Geotechnical Engineers use valuable jobsite data to validate their recommendations for de...
Helical piles are a proven deep foundation solution used across commercial, industrial, utility, and...
The two questions every helical pile engineer should ask when starting a new project are: What are...
This is an in depth explanation, through an example project, of how an engineer or contractor can u...
For buildings and structures, material selection, energy conservation methods and good water effici...
A review and overview on the Deep Foundations Institute's 49th Annual Conference on Deep Foundation...
Looking for more information? Fill in the form and we will contact CHANCE Foundation Solutions for you.